x

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt

f

SUPPLY CHAIN MASTER PLAN

Context and objectives

 Context:

In a rapidly changing market and in order to assist with internal reorganization, one of the industry leaders identified logistics as an important area for improvement. In this context, adameo was mandated to study the relevance of the development of the logistics plan and to propose an implementation plan.

 

Objectives: 

  • Identify the axes of optimization of current logistics
  • Define a deployment plan to implement the identified optimizations
  • Improve the staff productivity during interventions (replacement of meters, installation and maintenance of the existing network, etc.)

Approach adopted by adameo

  • Data collection, mining and processing (flows, number of kilometers, type of parts, routing planning , etc.) via information systems but also numerous field visits to operational staff
  • Study of the cost elements impacting logistics such as transport, staffing, platform rental and information systems (WMS, APS)
  • Design of several scenarios with a different number of platforms and evaluation of the logistic costs linked to the scenarios
  • Earnings estimation in Year n , n+1 and n+2
  • Implementation planning

RESULTS

  • Determining the best location for national and regional warehouses
  • Evaluation of the impacts of the scenarios on the logistics costs
  • Definition of a structured implementation plan allowing a deployment aligning with the group’s major deadlines